PLC Migration & Machine Control Retrofits
We upgrade aging machine controls to current platforms: Allen-Bradley SLC 500 and PLC-5 to CompactLogix or ControlLogix, and Siemens S7-300 to S7-1500, with updated drawings and a cutover planned around your production.
The goal is a machine that runs at least as well as before, with supported hardware, a readable program and accurate documentation.
- Rockwell, Siemens, Omron, SolidWorks, Inventor
- P.Eng. support where required
- Usually reply within one business day
- On-site in Metro Vancouver & Fraser Valley
Capabilities
Assessment
- Audit of controller, I/O, networks and devices
- Upload and review of the running program
- Drawing check and site survey
- Migration options with pros and cons
Conversion
- Program conversion and engineering review
- Restructuring or rewrite where it pays off
- HMI conversion or replacement
- Network upgrades to EtherNet/IP or PROFINET
Cutover
- Offline testing before the shutdown
- I/O checkout and functional testing
- Startup with product and fallback plan
- Operator and maintenance training
Deliverables
- 01Assessment summary with recommended approach
- 02Converted or rewritten PLC program (Studio 5000 or TIA Portal)
- 03Updated HMI application
- 04Updated electrical drawings and I/O list
- 05Cutover plan and test checklist
Tools & platforms
Who needs a PLC migration
Plants running machines on legacy controllers such as Allen-Bradley SLC 500 or PLC-5, or Siemens S7-300, that want to reduce the risk of a long breakdown and get back to supported hardware and software.
Problems we solve
- Spare parts for the old PLC are expensive or hard to find
- Only one person knows the old software, or no one does
- The program has no comments and the drawings are out of date
- The machine needs new functions the old controller cannot handle
In more detail
Convert, restructure or rewrite
Conversion tools translate old programs to the new platform, but the result keeps the old structure and needs careful review. Some systems are better rewritten from a sequence of operation. We recommend an approach after reviewing the existing program.
Phased migrations
If a long shutdown is not possible, the controller can be replaced first while keeping the existing I/O, and the I/O replaced later. Each step needs only a short shutdown.
Drawings that match the machine
A migration is a good time to fix the documentation. Electrical drawings and the I/O list are updated to match the new system, so maintenance can rely on them.
From first contact to handover
- 01AuditInventory of hardware, networks, devices, program and drawings.
- 02OptionsFull or phased migration, I/O strategy and target platform.
- 03ConvertProgram conversion or rewrite, HMI update and drawing update.
- 04TestOffline testing and bench setup before the shutdown.
- 05CutoverInstallation, I/O checkout, startup and fallback plan.
- 06HandoverTraining, final program files and as-built drawings.
Timelines depend on scope and how complete the input information is. The quote includes a proposed schedule.
Industries
- Food and beverage
- Packaging lines
- Process plants
- Material handling
- Manufacturing
On-site and remote
We are based in Delta, BC. On-site work covers Delta, Surrey, Langley, Abbotsford, Burnaby, Richmond and the rest of Metro Vancouver and the Fraser Valley. Design, drafting and programming can also be done remotely for clients across BC and Canada.
Service areasRelated services
Questions
How long will the machine be down during a PLC migration?
It depends on the size of the system and whether I/O and wiring are replaced. Most of the work, such as program conversion, testing and panel preparation, is done before the shutdown, so the downtime is used only for installation, checkout and startup.
Can we keep the existing I/O and wiring?
Often, yes. Adapters and wiring conversion systems can let a new controller use existing I/O or field wiring, so the upgrade can be done in phases. We check what is possible for your hardware during the assessment.
What if we do not have the PLC program?
The program can usually be uploaded from the running controller. Without comments or documentation it takes longer to review, so allow time for that in the plan.
How do you price a project?
Every project is quoted after we review your scope. The quote states what is included, the deliverables and the price. Send drawings, photos or a short description, and we will tell you what else we need to price it accurately.
Can you work with our in-house engineering team?
Yes. We can work as an extension of your team, taking on a sub-assembly, a drawing backlog, a control panel or a PLC program, and handing back files in your standards and templates.
Planning a PLC Upgrade?
Send photos of the panel, the PLC catalog numbers and the program if you have it, or call to talk it through.
- Drawings, sketches or CAD (PDF, STEP, DWG)
- What you need: design, controls, or both
- Quantity, timeline and site location
- Rockwell, Siemens, Omron, SolidWorks, Inventor
- P.Eng. support where required
- Usually reply within one business day
- On-site in Metro Vancouver & Fraser Valley
Delta, BC, Canada
